09.12.2014

Hoval biomass boilers support Stroud School’s sustainability

stroud-school-romsey-biolyts_1.jpg

As part of its drive to improve sustainability and reduce carbon emissions, Stroud School in Hampshire has installed Hoval biomass boilers to provide space heating and domestic hot water for the main school building and two new buildings. Installation of the new plant and an associated district heating network was carried out by Accolade Building Services.

Founded in 1926, Stroud School stands in 20 acres of grounds, which provide a wide range of facilities for pupils. Since 2012, it has been the preparatory school to King Edward VI School in Southampton.

Recent expansion has included the construction of two new stand-alone buildings – a classroom pod & resource room and a dining room & kitchen. “We were using LPG boilers and rather than introduce more LPG for the new buildings we decided to look for a more sustainable solution,” recalled the school’s Operations Manager Keith Goldie. “Having considered a number of options we chose biomass as being particularly suitable for a rural location while enabling us to take advantage of the Renewable Heat Incentive. It is also something we can use to help educate children about the alternatives to fossil fuels,” he added.

Specified by consulting engineers Henderson Green, the two 160 kW BioLyt biomass boilers, along with two 4000 litre buffer vessels also supplied by Hoval, have been installed in newly created plant rooms in the stable block. The boilers are served by an external silo storing locally sourced wood pellets.

Craig Beisley of Accolade Building Services explained: “The boilers are linked to a new underground district heating network which supplies low temperature hot water at 80°C to both of the new buildings and also to the main building, Highview House. In the new buildings the network provides underfloor heating and domestic hot water via heat interface units.

In Highview House plate heat exchangers are used to provide space heating and domestic hot water via an indirect cylinder. The district heating network also incorporates provision for future connections to additional buildings as the school expands. The project was completed on time and within budget and we were very pleased with the support we received from Hoval throughout.”

Further information:

Stroud School: www.stroud-kes.org.uk
Accolade Building Services: www.absme.co.uk

 
Close

More information


Cookies

A cookie is a small piece of text sent to your browser by a website that you visit. It helps the website to remember information about your visit, like your preferred language and other settings. That can make your next visit easier and the site more useful to you. Cookies play an important role. Without them, using the web would be a much more frustrating experience.


Terms of use

Privacy policy

Cookies help us deliver our services. By using our services, you agree to our use of cookies.